Skip to content

A Decrease font size. A Reset font size. A Increase font size.

Adelaide Metro Operations
  • Home
  • Permit to work
    • Submission times
    • Access requirements
    • Tram network safety
    • Fees and charges
    • Electrical safety
    • Resources
  • Technical Library
  • Log in or register
Adelaide Metro Operations
  • Home
  • Permit to work
    • Submission times
    • Access requirements
    • Tram network safety
    • Fees and charges
    • Electrical safety
    • Resources
  • Technical Library
  • Log in or register
Proud maintainers of the Adelaide tram network

Electrical Power (Traction Power and OHW) Engineering

TP2-DOC-003520 Traction DC Substation Design and Construction Tram System

TP2-DOC-003519 Tram System Overhead wiring system requirements for the 600v DC Tram Network Engineering Standard

TP2-DOC-002020 Guideline for Low Voltage Electrical Earthing and Bonding for the Adelaide Metro Tram Network

TC1-DOC-000463 Engineering Report Revision of Determination of Maximum Allowable Stagger and Mid Span Offset Signed Chief Eng 2

CE2-DOC 003522 Traction Power SCADA Functional and Performance Specification

ISO Logo

Permit to work

General information
Tram network safety
Submission times
Electrical safety
Fees and charges
Access requirements
Tram network information
Log in or register

© 2026 AMO